2N3A3110-C东芝模块TOSHIBA 2N3A3110-C,2N3A3620-B, 2N3A8130-A, 2N3A3120-D东芝模块, 东芝IGCT模块
芝集团创立于1875年,致力于为人类和地球的明天而努力奋斗,力争成为能创造丰富的价值并能为全人类的生活、文化作贡献的企业集团,东芝集团
业务领域包括数码产品、电子元器件、社会基础设备、家电等东芝模块TOSHIBA 2N3A3110-C安装调试.确保2N3A31 10-C在设定地址前完成电力
排线.2N3A3110-C先送内机电源再送外机电源,如果在开启室内机之前开启室外机,外机P.C.板 上7段显示码会显示E19,直至开启室内机电源。
.自动寻址可能会花费十分钟时间(正常为5分钟) .自动寻址要求在室外机操作。(仅打开电源不能自动寻址。 ) .自动寻址会使用到室外机P.C.板界面
上的SW15按键1.首先送上室内机电源,然后再送室外机电源。2.电源送上后确认室外主机P.C.板界面上7段显示板显示U.1.L08(此时U.1.闪烁)3.按下
SW15 (7段显示板有了变化松开,正常3秒左右)开始自动寻址(通常为5分钟)。4.7段 显示指示Auto1然后Auto2到Auto3指示U.1.- -(U.1. 闪烁)开
始在显示器上闪烁后。闪烁停止显示器显示U.1.- -(U.1.灯常亮,设定完成。调试前准备工作1.确定保压正常,系统无漏。2. 算好铜管每米追加量与
机组的修正量。3. 液管与气管阀门打开。
Toshiba module TOSHIBA 2N3A3110-C, 2N3A3620-B, 2N3A8130-A, 2N3A3120-D Toshiba module, Toshiba IGCT module
Founded in 1875, Toshiba Group is committed to striving for the future of humanity and the Earth, striving to become an enterprise group that can create rich value and contribute to the life and culture of all humanity. Toshiba Group
The business scope includes Toshiba modules TOSHIBA 2N3A3110-C installation and debugging for digital products, electronic components, social infrastructure equipment, home appliances, etc. Ensure that 2N3A3110-C completes power before setting the address
Flat cable. 2N3A3110-C, first send the internal unit power before sending the external unit power. If the outdoor unit is turned on before the indoor unit is turned on, the 7-segment display code on the P.C. board of the external unit will display E19 until the indoor unit power is turned on.
Automatic addressing may take up to ten minutes (normally 5 minutes). Automatic addressing requires operation from an outdoor unit. (Only turning on the power cannot automatically address.). Automatic addressing will be used on the P.C. board interface of the outdoor unit
SW15 button 1. First, power on the indoor unit, and then power on the outdoor unit. 2. After the power is turned on, confirm that the 7-segment display board on the P.C. board interface of the outdoor host shows U.1.L08 (at this time, U.1. flashes) 3. Press
SW15 (the 7-segment display board has changed and is released, usually about 3 seconds) starts automatic addressing (usually 5 minutes). 4.7 segment displays Auto1, then Auto2 to Auto3 indicates U.1-- (U.1 Flashing on
After flashing on the monitor. Flashing stops the display of U.1- (U.1. The light remains on and the setting is complete. Preparation before debugging: 1. Confirm that the pressure is maintained normally and the system is leak free. 2 Calculate the additional quantity per meter of copper pipes and
The correction amount of the unit. 3. Open the liquid and gas pipe valves.
Copyright © 2022-2024 厦门雄霸电子商务有限公司 版权所有 备案号:闽ICP备14012685号-33