您好,欢迎进入厦门雄霸电子商务有限公司!

全国咨询热线

18059884797

热门关键词: ABB GE A-B TRICONEX Schneider

METSO IOP331 控制器

METSO  IOP331 控制器

品牌
METSO美卓
产品类型
数字输出模块卡件
加工定制
额定电压
正常
电压
正常
规格
正常
内径
正常
冷却介质
正常
出气管直径
正常
可售卖地
北京;天津;河北;山西;内蒙古;辽宁;吉林;黑龙江;上海;江苏;浙江;安徽;福建;江西;山东;河南;湖北;湖南;广东;广西;海南;重庆;四川;贵州;云南;西藏;陕西;甘肃;青海;宁夏;新疆
类型
二手九五新
型号
IOP331


联系电话:18059884797

产品详情

METSO  IOP331 控制器

METSO  IOP331(3).jpg

0P331美卓METSO控制器,

PLC是以功能命名,DCS是以体系结构命名。

??从原理上看 PLC就可以组成DCS

??当然两者性能差异还是存在的,要具体看产品和需要

??DCS控制系统与PLC控制系统区别:

??DCS是一种“分散式控制系统”,而 PLC(可编程控制)只是一种控制“装置”两者是“系统”与“装置”的区别。系统可以实现任何装置的功能与协调,PLC装置只实现本单元所具备的功能。

?DCS网络是整个系统的神经,DCS系统通常采用的国际标准协议 TCP/P。它是安全可靠双几余的高速通讯网络 系统的拓展性与开放性再好,而 PLC因为基本上都为单个小系统工作在与别的PLC或上位机进行通讯时,所采用的网络形式基本都是单网结构,网络协议也经常与国际标准不符。

??DCS整体考虑方案 操作员站都具备工程师站功能 站与站之间在运行方案程序下装后是一种紧密联合的关系,任何站、任何功能、任何被控装署间都是相互连销控制,协调控制而单用 PLC写相接构成的系统,其站与(PLC与PLC)之间的联系则是一种松散连接方式,做不出协调控制的功能。

METSO  IOP331 控制器

METSO  IOP331(3).jpg


0P331 METSO Controller,

PLC is named after the function,DCS is named after the architecture.

?? In principle, PLC can form DCS

?? Of course, there are still performance differences between the two, depending on the specific product and needs

?? DCS control system and PLC control system difference:

?? DCS is a "distributed control system", and PLC(programmable control) is just a control "device", the two are "system" and "device" difference. The system can realize the functions and coordination of any device, and the PLC device only realizes the functions of this unit.

? DCS network is the nerve of the whole system,DCS system usually adopts the international standard protocol TCP/P. It is a safe and reliable high-speed communication network system expansion and openness, and PLC because basically for a single small system to work with other PLC or PC communication, the network form used is basically a single network structure, the network protocol is often inconsistent with international standards.

?? DCS as a whole, the program operator station has a close joint relationship between the functional station and the station after the installation of the operation program, and any station, any function, and any controlled installation are mutually connected control, coordinated control and single use The system composed of PLC write connection, the connection between the station and (PLC and PLC) is a loose connection, can not do the function of coordination control.

METSO  IOP331 控制器

METSO  IOP331(5).jpg

姗姗名片合并2(1).jpg


在厦门雄霸电子商务有限公司,我们为拥有专注的工业自动化方法而感到自豪。我们的使命是只销售属于我们独特专业知识的狭窄产品线,并以比竞争对手更高的精度和效率为客户服务。由于我们只专注于少数精选制造商,因此我们可以保持库存集合的范围和质量无与伦比。这种专业化还使我们能够培训我们的销售代表识别相关零件编号,就修订兼容性向客户提供建议,甚至在需要时提供技术协助。由于这种激光般的专注,我们客户的询价总是能很快得到有竞争力的详细报价。此外,由于厦门雄霸电子商务有限公司每天向国际客户销售,因此我们有能力准备所有必需的文件,以确保快速的海关流程和及时的交货。

查看更多 >>

产品推荐

18059884797